Thursday 2 May 2019

Prospective SPGs

"April 14th 1944

Confirmed: Chief of the GBTU USA, Major General of the Tank Engineering Service, Alymov

Plan of the 3rd Department of the GBTU USA for April-May 1944

Work
Executor
Due date
Controlling the completion of 100 mm D-10S gun installation into the SU-100 at factory #9 and the Uralmash factory.
Konev
May 1st, 1944
Organizing and performing large scale trials of the SU-100 from the first batch.
Konev
June 1st, 1944
Taking part in SU-152M trials with an OBM-143 gun and giving conclusions.
Ryabtsev
May 1st, 1944
Controlling the installation of and participation in trials of the 122 mm high power gun into the ISU. Giving conclusions.
Ryabtsev
May 15th, 1944
Controlling the production and testing of the 85 mm high power gun.
Konev
June 1st, 1944
Organizing and execution of trials of the SU-85 (GAZ). Giving conclusions.
Volgushev
May 15th, 1944
Controlling experimental work at factory #38:


·         Testing the installation of the 122 mm howitzer into the SU-76M
Afanasenkov
May 15th, 1944
·         Correction of defects of the SU-37 discovered during proving grounds trials.
Vasilevskiy
May 1st, 1944
·         Organization and execution of SU-37 trials after the prototype is improved. Giving conclusions.
Vasilevskiy, Volgushev
May 20th, 1944
Organization and execution of proving grounds trials of the SU-37 produced by factory #40. Giving conclusions.
Vasilevskiy, Volgushev
May 15th, 1944


Via Yuri Pasholok.

1 comment:

  1. Would be interesting how the installation of the 122 howitzer on the SU-76 went. Looking at this list, there's still a lot of focus on "what can we produce with the T-70 chassis"?

    ReplyDelete